Jan. 8th Construction at the house on the hill. We were lucky to have help from the
Construction continued on the storage building. Side walls were covered with steel sheeting and the roof was started. The construction materials for the side walls of the home arrived and had to be carried by people power up the hill to the site. This was a very difficult task since the concrete posts and slabs each weigh over 200 pounds. Yes, we were busy and had a very good day. Glen H.